Clients
|
P&G _____________________________________________________________________ |
|
|
Bethesda North Hospital _____________________________________________________________________
|
|
|
Avon Products Installed (4) 750 ton chillers in place of (3) absorbtion chillers. Installed 69KV Electrical yard to power chillers. This was all design/build work. The payback on this job was 3.2 years.
_____________________________________________________________________ |
|
|
Dixie Terminal A design build project in a 10 story building that was built in 1922. The payback was 2.5 years on the digital control system. _____________________________________________________________________ |
|
|
3 East 4th Street A multitude of design/build replacement projects with direct digital controls _____________________________________________________________________ |
|
|
Urban Active – West Chester Just one of a dozen fitness centers that we have built for Urban Active. _____________________________________________________________________ |
|
|
Macy’s Renovated the HVAC systems on 10 floors. Installed 200 ton dedicated outdoor air system for increased employee Occupancy _____________________________________________________________________ |
|
|
Cincinnati Christian Hills Academy Installed all HVAC systems in new building and additions for private school. _____________________________________________________________________ |
|
|
Borcherding Buick One of our many (50+) design/build automobile dealerships in the tri-state area. _____________________________________________________________________ |
|
|
All Saints Church One of our church design/build jobs working closely with Arch net for energy efficient systems. _____________________________________________________________________ |
|
|
Performance Lexus A state of the art automobile dealership with active HVAC energy management controls.
|


